ABB Group Supply of 480m Spring Steel Buffas When the ABB Group expanded its Qld operations, a barrier was required for their new loading facility. The barrier had to be capable of withstanding heavy vehicle glancing blows and be narrow so as not to impede traffic flow. In addition, areas of the barrier needed to conform to the anti-climb requirements as stipulated in AS2890.